14/09/2019

Expansion of the warehouse capacity in Parallel EOOD

  • Customer: Parallel EAD
  • Industry: Production and distribution of mattresses, furniture and materials for furniture production.
  • Location: Sevlievo
  • Period of implementation of the project: It took 6 months from the development of the project to its full implementation.
  • Challenge: In connection with the expansion of production activities, Parallel EAD has to dramatically expand the capacity of its warehouse facilities.
  • Solution of STAM LTD: Our proposal was to dismantle the existing old racks and build racks of the already known Radio Shuttle System in their place. Thanks to this, we have achieved nearly three times the capacity of the same storage area.