Client: Bingo d.o.o. Tuzla is the largest retail chain and one of the leading distribution companies in Bosnia and Herzegovina. With an extensive network of supermarkets, hypermarkets, and wholesale facilities, Bingo serves millions of customers and manages a complex supply chain supporting a wide range of FMCG products. The company continuously invests in modern logistics infrastructure and advanced technologies to enhance operational efficiency and support its ongoing growth;
Industry and Specifics: FMCG distribution requires high-throughput logistics operations capable of handling thousands of pallets daily while ensuring speed, accuracy, and uninterrupted product flow. As distribution volumes increase, warehouses face challenges related to forklift traffic, labor-intensive pallet transport, space utilization, and operational safety. Automated pallet handling solutions are essential for improving productivity, inventory traceability, and warehouse performance while supporting scalable growth;
Solution Provided: STAMH Group engineered, delivered, and installed a comprehensive Automated Pallet Conveyor System combined with a Mobile Racking Storage System. The solution was designed to automate pallet transportation between key warehouse areas and optimize storage density while improving operational efficiency. Key benefits of the project include:
- Automated horizontal and vertical pallet transport;
- Reduced forklift traffic and improved workplace safety;
- Increased warehouse throughput and productivity;
- Lower operating and labor costs;
- Enhanced pallet traceability and inventory control;
- Optimized warehouse space utilization through high-density storage;
- Scalable logistics infrastructure supporting future business growth;
This project demonstrates how advanced warehouse automation and intelligent storage systems can transform FMCG distribution operations into a faster, safer, and more cost-efficient logistics environment;
Learn more about Bingo Tuzla and the Automated Pallet Conveyor and Storage System engineered and implemented by STAMH Group in Bosnia and Herzegovina;